Verify that all mechanical parts have been aligned and securely mounted.

Ensuring features like and DDO (Door Disconnect Operation) are toggled to prevent public use during the manual update.

: Often initiated during a "Learn Run" where the elevator travels the full length of the shaft to record floor levels and limit switch positions.