Ensuring that facilities are designed to prevent leaks, fires, and structural failures, protecting both personnel and the environment.
Containerization is the ultimate solution to dependency management. If a script has heavy or complex dependencies, wrap it in a container.
# --- DEPENDENCIES BEGIN --- # SHELL_REQUIRED: bash >=4.0 # COMMANDS_REQUIRED: jq, curl, awk, sed, grep # COMMANDS_OPTIONAL: bc, git # ENV_REQUIRED: API_KEY, DATABASE_URL # ENV_OPTIONAL: LOG_LEVEL # --- DEPENDENCIES END ---
: Detailed rules for specific disciplines such as piping, mechanical, electrical, and civil engineering. Standard Drawings
Shell DEPs cover a wide range of engineering disciplines, categorized by functional areas:
A strong recommendation where deviations must be justified. May: A suggested option or permissible practice. Why DEPs Matter for Contractors and Vendors
If a DEP requirement is impossible or uneconomical for a specific situation (e.g., a one-off low-pressure nitrogen line), you must submit a . The DR includes:
Ensuring that facilities are designed to prevent leaks, fires, and structural failures, protecting both personnel and the environment.
Containerization is the ultimate solution to dependency management. If a script has heavy or complex dependencies, wrap it in a container. shell dep standards
# --- DEPENDENCIES BEGIN --- # SHELL_REQUIRED: bash >=4.0 # COMMANDS_REQUIRED: jq, curl, awk, sed, grep # COMMANDS_OPTIONAL: bc, git # ENV_REQUIRED: API_KEY, DATABASE_URL # ENV_OPTIONAL: LOG_LEVEL # --- DEPENDENCIES END --- Ensuring that facilities are designed to prevent leaks,
: Detailed rules for specific disciplines such as piping, mechanical, electrical, and civil engineering. Standard Drawings # --- DEPENDENCIES BEGIN --- # SHELL_REQUIRED: bash >=4
Shell DEPs cover a wide range of engineering disciplines, categorized by functional areas:
A strong recommendation where deviations must be justified. May: A suggested option or permissible practice. Why DEPs Matter for Contractors and Vendors
If a DEP requirement is impossible or uneconomical for a specific situation (e.g., a one-off low-pressure nitrogen line), you must submit a . The DR includes: